Key projects include:

Client

Project

Capabilities

Rio Tinto Iron Ore Ports electrical infrastructure upgrade, WA Electrical and control system engineering design to replace substations at two port sites
BHP Billiton New process facility at Olympic Dam, SA Multidiscipline EPCM contractor
Port Hedland Port Authority Constructability study, WA Multidiscipline detailed constructability study, cost estimates and recommendations for Shiploaders
Lihir Gold (now Newcrest) Gold leaching plant, Papua New Guinea Multidiscipline detailed design to procurement functions
CITIC Pacific Sino Iron wharf conveyor, WA Multidiscipline engineering design, project management, procurement and construction management services
Curragh (Wesfarmers Resources) Coal handling preparation plant, QLD Operational readiness services
BMA Coal washplant upgrade, QLD Mechanical engineering, detailed design to delivery at Peak Downs
AngloCoal Coal operations, QLD Operational readiness solutions
Assmang, Sandvik Iron ore mine, South Africa Mobile machine optimisation and automation, Stockyard Management Systems
BMA Various coal mine operations, Bowen Basin, QLD Control system engineering support, hazardous area services

 

 
 
 
 
“...honestly the (LogiCamms) team I have dealt with have provided ideal, 10 out of 10 support. I have no hesitation in recommending them to any other job I am involved in.”
Michael Pietrobhon, BHP Billiton 
 
 
 
 
 
 
“The leadership and performance of your company representatives was noteably impressive. They effectively managed and supported the various work fronts that they were involved with and contributed significantly to the exceptional safety results achieved and the overall success of the shutdown.”
LNG Shutdown Manager, ConocoPhillips